WAARDEN CONTACT

Engineers design.WAARDEN checks.

Automated drawing verification for substation and P&C design packages. WAARDEN performs the mechanical checking engineers do by hand, including back-checks and cross-drawing verification, and completes it in minutes rather than weeks.

SEE IT WORK ↓

For every new entrant under 25,

2.4 energy workers are nearing retirement.

Two of every three hires between now and 2035 will only replace someone who left.

INTERNATIONAL ENERGY AGENCYWORLD ENERGY EMPLOYMENT 2025
ADVANCED ECONOMIES

GENERAL NOTES

  1. Grid investment passed USD 400 billion in 2025, and electricity demand is expected to rise about 40% by 2035. More projects means more design packages to check.
  2. The experienced engineers who check those packages are retiring faster than they are being replaced.
  3. Firms will need to deliver more work with fewer people. WAARDEN makes drawing verification fast enough to keep pace.

SOURCE: IEA, WORLD ENERGY INVESTMENT 2025; WORLD ENERGY OUTLOOK 2025

FEATURE
01

Back-check

AVAILABLE NOW

Give it the marked-up sheet and the drafted sheet. WAARDEN compares them and flags every markup that didn't carry through.

MARKED-UP DRAFTED 52-1 TRANSFORMER C-4021 52-3 138 kV BUS 1 WAARDEN 89-1 90-5 CT 1200 /5 1000 138 kV WAARDEN BUS 1 90-5 CT 1200/5 ! MARKUP NOT CARRIED THROUGHCT RATIO SHOULD READ 1000/5

3 MARKUPS  /  2 CARRIED THROUGH  /  1 FLAGGED

FEATURE
02

Cross-drawing checks

IN DEVELOPMENT

Checks that span drawings, like the wiring schedule against the termination drawings, settled against the schematic.

WIRE SCHEDULE SAYS FROM TO DWG DWG 4 SHOWS LL3 FIX TO TB3-2 SCHEMATIC, DWG 2 125 VDC (+) 52a TB3-2 LL3-2 94X 125 VDC (−)

TB3-2 lands on LL3-2. The schedule was right. The callout on DWG 4 is wrong.

FEATURE
03

Full-package review

PLANNED

Standards and completeness across every sheet in the package, in one pass, before it goes out the door.

ONE PACKAGE, 100 DRAWINGS
CHECKED
0/ 100
~5 minutes
17 flagged for review

THE SAME PACKAGE BY HAND
~40 hours

A week of checking, handed back.About 99% less time.

Engineers design.WAARDEN checks.

Schedule a consultation to review your current drawing verification process and identify where WAARDEN can reduce review time.