Engineers design.WAARDEN checks.
Automated drawing verification for substation and P&C design packages. WAARDEN performs the mechanical checking engineers do by hand, including back-checks and cross-drawing verification, and completes it in minutes rather than weeks.
SEE IT WORK ↓For every new entrant under 25,
2.4 energy workers are nearing retirement.
Two of every three hires between now and 2035 will only replace someone who left.
ADVANCED ECONOMIES
GENERAL NOTES
- Grid investment passed USD 400 billion in 2025, and electricity demand is expected to rise about 40% by 2035. More projects means more design packages to check.
- The experienced engineers who check those packages are retiring faster than they are being replaced.
- Firms will need to deliver more work with fewer people. WAARDEN makes drawing verification fast enough to keep pace.
SOURCE: IEA, WORLD ENERGY INVESTMENT 2025; WORLD ENERGY OUTLOOK 2025
Back-check
AVAILABLE NOWGive it the marked-up sheet and the drafted sheet. WAARDEN compares them and flags every markup that didn't carry through.
3 MARKUPS / 2 CARRIED THROUGH / 1 FLAGGED
Cross-drawing checks
IN DEVELOPMENTChecks that span drawings, like the wiring schedule against the termination drawings, settled against the schematic.
TB3-2 lands on LL3-2. The schedule was right. The callout on DWG 4 is wrong.
Full-package review
PLANNEDStandards and completeness across every sheet in the package, in one pass, before it goes out the door.
A week of checking, handed back.About 99% less time.
Engineers design.WAARDEN checks.
Schedule a consultation to review your current drawing verification process and identify where WAARDEN can reduce review time.